Generation of Energy by Wind at
Nyala
Name of Project:
|
Generation of Energy by Wind
at Nyala. |
Location:
|
Nyala town – Southern Darfur
State |
Project Description :
|
Installation of two
generation units in two stages. The first is with a capacity of 1.5
mgw; and the second stage is with a capacity of 2 mgw. |
Present situation :
|
The feasibility study had
been prepared by Lahmere Consultancy Co. (German.) |
Total Cost :
|
The first stage: US$ 2
millions; and the second stage: US $ 2.7 millions. |
Implementation Period : |
2 years. |
Objectives : |
-
The
introduction of the new and renewable energy system.
-
Increase of the Western network.
-
Maintaining the stability of the electric current. |
Contact Address:
|
The National Electricity
Corporation,
The Planning General
Administration,
Tel : 771359/ 776321.
e-mail:
osman@necsudan.com
|
New Generation at Bagair
Name of Project:
|
New Generation at Bagair. |
Location:
|
El-Gezira State, Al-Bagair
area, 42 kms from the centre of Khartoum. |
Project Description :
|
Installation of generation
unit with the capacity of 300 mgw and linking it to the national
network, according to the BOT system, for an agreed period of 25
years. |
Present situation :
|
The land is ready and is
owned by the National Electricity Corporation. |
Implementation Period : |
3 years. |
Objectives : |
-
Continuous current for the neighbouring GIAD Industrial Area.
-
Meeting the increasing demand on electricity, because of the
residential expansion in
Khartoum (the capital) area. |
Contact Address:
|
The National Electricity
Corporation,
The Planning General
Administration,
Tel : 771359/ 776321.
e-mail:
osman@necsudan.com
|
|
|
Al-Shiraik Dam
Name of Project:
|
Al-Shiraik Dam |
Location:
|
River Nile State
|
Project Description :
|
The Project is formed from
the construction of Al-Shiraik Dam on the River Nile, at the fifth
cataract, the construction of an electricity generation station
attached to it, with a capacity of 315 mgw, electricity transmission
lines of 220 kv, from Al-Shiraik to Khartoum, transformer stations
at Atbara, Shendi and Khartoum North, resettlement of those affected
by the project and establishment of agricultural projects for them. |
Present situation :
|
The feasibility studies and
the engineering designs are ready. |
Implementation Period : |
5 years. |
Objectives : |
-
Addition of new hydro-electric generation system in the
River Nile State and linking
it to the national network, to meet the increasing demand for
electric energy.
-
Increasing the dependability of the electric supply.
-
Benefiting from the potential cheep hydro-electric energy at the
fifth cataract of the River Nile. |
Contact Address:
|
The National Electricity
Corporation,
The Planning General
Administration,
Tel : 771359/ 776321.
e-mail:
osman@necsudan.com
|
Reinforcing the Destribution
Network in the centre of Khartoum
Name of Project:
|
Reinforcing the Destribution
Network in the centre of Khartoum. |
Location:
|
Khartoum (The Capital ) |
Project Description :
|
Addition of 2 x 35
mgv ampere and 110/33/11 kv transformer to Al-Ghaba 110/33/11 kv. |
Present situation :
|
The project is included in
the plan of the National Electricity Corporation and there are
feasibility studies at the Planning Secretariat at the Ministry. |
Total Cost :
|
US $ 19 millions. |
Implementation Period : |
One years. |
Objectives : |
-
Meeting the increasing demand for energy in the area.
-
Making the maximum benefit of the available generation in the
network (i.e. effective network distribution).
-
Increase of sales.
-
Curbing programmed and unprogr-ammed black-outs and electricity
cuts. |
Contact Address:
|
The National Electricity
Corporation,
The Planning General
Administration,
Tel : 771359/ 776321.
e-mail:
osman@necsudan.com
|
|
|
Transmission Line 220 kv, from
Rabak to El-Obied.
Name of Project:
|
Transmission Line 220 kv,
from Rabak to El-Obied. |
Location:
|
Kordofan and White Nile
States. |
Project Description :
|
Transmission line 220 k.v.
from Rabak to El-Obied; and a transformer station 220/33/11 kv at
El-Obied. |
Present situation :
|
The Project is included in
the National Electricity Corporation plan for the expansion of the
national network. |
Total Cost :
|
US $ 70 millions. |
Implementation Period : |
3 years. |
Objectives : |
-
Transmission of electric energy from the national network, to
Kordofan State,
-
Meeting the increasing demand on energy in the industrial and
agricultural fields. |
Contact Address:
|
The National Electricity
Corporation,
The Planning General
Administration,
Tel : 771359/ 776321.
e-mail:
osman@necsudan.com
|
|
|
Khartoum New Airport
Name of Project:
|
Khartoum New Airport
|
Location:
|
Khartoum state |
Project description :
|
Establishment of an airport
with high technical qualifications matching the international
airports and according with the qualifications of the International
Civil Aviation Organization (ICAO) |
Total Cost :
|
About US D 236 million |
Contact Address:
|
Ministry of Aviation,
The Public Corporation for
Civil Aviation,
Department of Planning.
Tel : 0249-183-773778 |
Port Sudan Airport
Name of Project:
|
Port Sudan Airport
|
Location:
|
Port Sudan town |
Project description :
|
Development of the airport
so as to Operate as a substitute for the existing Khartoum
International airport. |
Total Cost :
|
About US D 2 million |
Contact Address:
|
Ministry of Aviation,
The Public Corporation for
Civil Aviation,
Department of Planning.
Tel : 0249-183-773778 |
Air Radar System
Name of Project:
|
Air Radar System
|
Location:
|
Khartoum town |
Project description :
|
Promotion and development of
Air forecasting and other sectors. |
Total Cost :
|
About US D 2,5 million |
Contact Address:
|
Ministry of Aviation,
The Public Corporation for
Civil Aviation,
Department of Planning.
Tel : 0249-183-773778 |
Malakal Airport
Name of Project:
|
Malakal Airport |
Location:
|
Town of Malakal |
Project description :
|
Rehabilitation of the
airport to make it similar to other airports because of its military
and Service significance. |
Total Cost :
|
About US D 4 million |
Contact Address:
|
Ministry of Aviation,
The Public Corporation for
Civil Aviation,
Department of Planning.
Tel : 0249-183-773778 |
Abu Gibieha Airport
Name of Project:
|
Abu Gibieha Airport
|
Location:
|
Southern Kordofan State |
Project description :
|
Establishment of the airport
and establishment of fruits refrigeration stores as, the area is
characterized with abundancy of production of fruits and vegetables,
wildlife and fantastic picturesque areas for tourist, which were not
yet utilized due to the shortage of speedy means of transport, which
in turn attributed to the unavailability of infrastructures.
|
Total Cost :
|
About US D 14 million |
Contact Address:
|
Ministry of Aviation,
The Public Corporation for
Civil Aviation,
Department of Planning.
Tel : 0249-183-773778 |
Osaif Iron Ore Export Port.
The Project:
|
Osaif Iron Ore Export Port. |
Location:
|
Osaif region, 260 kms North
of Port Sudan town. |
Project Description: |
The construction of a dock
with a length of 320 meters and 16/20 meters deep, which may house
ships of 70-100 thousands tons load, in addition to handling
equipment. |
Current situation:
|
The project is included in
the corporations plan for the export of iron ore and other metals. |
Estimated Cost: |
US$D 20 millions. |
Implementation Period: |
18 months. |
Objectives:
|
-
Receiving ships of 70-100 thousands tons load.
-
Export of iron ore and other metals.
-
Encouragement of tourism.
-
Development of the fishing, shells and the
Kokian industries.
|
The Resulting Benefits: |
-
The
establishing of a specialized port for the transport of iron ore,
the marketing of raw iron in the far East and European markets and
the development of the region by exploiting its wealth of raw
materials and the other resources of the Red Sea. |
Contact Address:
|
Sea Ports Corporation,
Tel : 22799 – 22161 – 22250
Fax: 00249-3118-39383
|
|
E-mail:spcp@sudanmail.net
|
|
|
|
|
|
|
The New Suwakin Port
Project: |
The New Suwakin Port
|
Location:
|
The Project is located at (Akwai)
region, at a distance of (45) kms to the South of Port Sudan town. |
Project Description:
|
Establishment of a
specialized port for handling containers at (Akwai) harbour.
|
Current Situation: |
The project is included in
the Corporation’s plan to meet the growth in the volume of transport
by containers. |
Estimate Cost: |
US $ 60 millions. (the first
stage = construction of two docks.) |
Implementation Period: |
18 months |
Objectives: |
-
Receiving the containers ships of determined
specifications of the fifth generation.
-
Offering port services to the Red Sea Free
Zone.
-
Addition of areas for storage of containers.
-
Meeting the increasing demand for the use of
containers in transport.
-
Serving the purposes of the free zone.
|
The
Resulting : |
Benefits: the
increase of export and import movement by containers and the
contribution of the raising the absorption capacity of the Sudanese
ports. |
Contact Address : |
The Sea Ports Corporations,
Tel : 22799 – 22161 – 22250
Fax : 00249/3118/39383
E-mail:spcp@sudanmail.net
|
|
|
|
|
Establishment of the Green Area
Docks Project (The second stage.)
Project: |
Establishment of the Green
Area Docks Project (The second stage.) |
|
Location:
|
The project is
located in the South–Eastern side of Port Sudan Port. |
|
Project Description:
|
The project is constituted
of establishing a dock with a length of (200 meters) and a depth of
14.5m2.); in addition to a storage area behind the dock
of about (200m2) for the accommodation of ship of (50
thousands tons), which shall be specified for handling the loose
grains exports. |
Current Situation: |
The project is included in
the plan for developing the Sea Ports Corporation. |
Estimate Cost: |
US $ 20 millions. (the
estimated cost for the deepening and construction of the dock.). |
Implementation Period: |
18 months |
Objectives: |
-
Expansion in the construction of docks and
ports, on the light of the economic changes; such as, the
application of the economic openness, export of petroleum and the
expectations of the World Trade Agreement.
|
The
Resulting
Benefits : |
-
Providing docks for receiving ships of 50-60 thousands tons load.
-
The
safeguarding of the
Sudan’s exports and import movement, by not depending on one port.
-
The
allocation of a site inside the port for the construction of grain
silos and cement stores.
-
Absorption of the expected changes in the ports movement.
|
Contact Address : |
The Sea Ports Corporations,
Tel : 22799 – 22161 – 22250
Fax : 00249/3118/39383
E-mail:spcp@sudanmail.net
|
|
|
|
|
|
|
Cattle and Fish Wealth
Specialized Export Project Suwakin
Project: |
Cattle and Fish Wealth
Specialized Export Project Suwakin. |
Location:
|
Suwakin |
Project Description:
|
The Construction of a
specialized port for the export of cattle and fish wealth. |
Current Situation: |
The project is included in
the Quarter Century plan of the Corporation. |
Estimate Cost: |
US $ 15 millions.
|
Implementation Period: |
36 months |
Objectives: |
-
Construction of a specialized port for the export of cattle.
-
Offering distinguished services for marketing cattle exports.
-
Meeting the regional and international market requirements.
-
Making use of the fish wealth. |
|
|
Contact Address : |
The Sea Ports Corporations,
Tel : 22799 – 22161 – 22250
Fax : 00249/3118/39383
E-mail:spcp@sudanmail.net
|
|
|